{"product_id":"check-cord-dog-leash-long-lead-obedience-recall-training-b07vj8fycd","title":"Check Cord Dog Leash Long Lead Obedience Recall Training Tracking","description":"\u003cp\u003eOur team selected Check Cord Dog Leash Long Lead Obedience Recall Training Tracking for dog owners who want a proven, well-reviewed option in training leashes.\u003c\/p\u003e\u003ch3\u003eKey Features\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSuitable Thickness Check Cord:\u003c\/strong\u003e To find a balance between weight and strength. 3\/8” is a suitable thickness for long training dog leash, it has both strength and portability\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNo Tangle Long Rope Leash:\u003c\/strong\u003e the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and…\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLightweight And Not Absorb Water:\u003c\/strong\u003e soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSoft And Durable Double Layer Woven Handle:\u003c\/strong\u003e check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSize:\u003c\/strong\u003e 3\/8\" (9.5 mm) in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003ePick your preferred color and pattern above to see photos and pricing for each option. Big Frenchies carries a curated selection of pet supplies so you can shop everything your dog needs in one place.\u003c\/p\u003e","brand":"DS-AMZ","offers":[{"title":"Blue \/ 3\/8 inch * 50foot","offer_id":50598908985584,"sku":"AMZ-B08HM4ZBJS","price":52.48,"currency_code":"USD","in_stock":true},{"title":"Blue \/ 3\/8 inch * 30foot","offer_id":50598909018352,"sku":"AMZ-B08HM4QFDR","price":44.98,"currency_code":"USD","in_stock":true},{"title":"Purple \/ 3\/8 inch * 30foot","offer_id":50598909051120,"sku":"AMZ-B08HM2ZG5C","price":43.48,"currency_code":"USD","in_stock":true},{"title":"Purple \/ 3\/8 inch * 50foot","offer_id":50598909083888,"sku":"AMZ-B08HM1ZD5J","price":52.48,"currency_code":"USD","in_stock":true},{"title":"Orange \/ 3\/8 inch * 15foot","offer_id":50598909116656,"sku":"AMZ-B07WPPG9JL","price":34.9,"currency_code":"USD","in_stock":true},{"title":"Orange \/ 3\/8 inch * 50foot","offer_id":50598909149424,"sku":"AMZ-B07VDY7ZNS","price":52.48,"currency_code":"USD","in_stock":true},{"title":"Red \/ 3\/8 inch * 15foot","offer_id":50598909182192,"sku":"AMZ-B08HJ1SCFY","price":34.9,"currency_code":"USD","in_stock":true},{"title":"Red \/ 3\/8 inch * 30foot","offer_id":50598909214960,"sku":"AMZ-B08HJ1RHDT","price":44.48,"currency_code":"USD","in_stock":true},{"title":"Orange \/ 3\/8 inch * 30foot","offer_id":50598909247728,"sku":"AMZ-B07VJ8FYCD","price":37.48,"currency_code":"USD","in_stock":true},{"title":"Black \/ 3\/8 inch * 15foot","offer_id":50598909280496,"sku":"AMZ-B07WYTJ73P","price":34.23,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0434\/7985\/9361\/files\/61EGZ9DIpUL._AC_SL1500.jpg?v=1791678901","url":"https:\/\/www.bigfrenchies.com\/products\/check-cord-dog-leash-long-lead-obedience-recall-training-b07vj8fycd","provider":"BIG FRENCHIES","version":"1.0","type":"link"}