Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
- Regular Price
- $53.90
- Sale Price
- $53.90
- Regular Price
- Unit Price
- per
Details
About This
- Reflective Dog Tie Out Cable: 50ft long dog tie out cable, high strength tested for small-large dogs up to 250lbs. Our dog runner cables&leashes are the top choice for free-running dogs in outside, yard or camping, providing more room for running or training and play.
- Heavy Duty Durable Clip: This outside dog leads&chains with 360° free rotation sturdy clasp, lightweight, durable and rust-proof. The ends of the dog tie out cable will be easily attached to a spiral ground stake, tree trunk or fence. The twist lock does not tangle the cable and is used to keep pets safe outdoors.
- Chew Proof Dog Leash: Dog tie out cable are made of strong steel wire rope and soft transparent pvc, which are anti-chew and rust-proof. The clip with safety lock allows the dog runner cable to be used in a variety of situations and also as a training leash for dogs.
- More Size and Color Options: 10/15/20/30/50 feet dog lead line, builds up quickly on a stake, giving your dog more room to roam. Your dog loves the outdoors and can use it in camping, parks, yards or the beach.
- Dog Cable for Pet Lovers: Dog tie out cable system creates a safe area that allows your dogs to come and go freely while preventing them being distracted and escaping from the camp,yard. This is a good gifts for dog lovers. If you encounter any quality problems with our products, please feel free to contact us, we will solve the problem for you in time.
Overview
- Size : 250lbs 50FT
- Color : Green
- Brand : Evilplan
- Material : Alloy Steel
- Product Dimensions : 600"L x 0.2"W
Shipping & Delivery
How long will it take to ship my order?
Your order will be shipped within 3-8 business days.
How much does it cost?
We offer free trackable shipping on select items.
Shipping rates for partner brand items and international orders may vary and will be calculated at checkout.
Where is my order shipped from?
Big Frenchies apparel is shipped in plastic-free packaging directly from our Virginia facility. Items from our partner brands may have different packaging and can be shipped from any of their fulfillment locations worldwide.
How long does shipping take?
USA: 3-8 business days
CA, AUS, UK, and Europe: 5-21 business days
Rest of world: 5-25 business days
Return Policy
As a small family-owned business, we thrive on your feedback, so it's vitally important for us to make sure you're happy with your purchase.
Our return policy is simple: You have 7 days from delivery to request a return or exchange for most products shipped within the United States.
Customers are responsible for return shipping costs unless the return is due to a defective product. Learn more about our full return policy.
Please note:
- Returns are only available for US orders. International orders are final sale.
- For health and safety reasons, personal care items (like baby creams, shampoos, balms, sunscreens, and lotions) and food products cannot be returned once opened.
- Custom and handmade items are final sale and cannot be returned or exchanged, as they are crafted specifically to order.
- A restocking fee may apply to certain eligible returns. If applicable, this will be communicated upon return authorization.
You can reach out to our customer support team by submitting your request via the "Contact Us" form or by emailing us at support@bigfrenchies.com. A member of our support staff will respond to you as soon as possible.
Need Help? Get In Touch.
We'd love to hear from you!
The best way to reach us is via email: support@bigfrenchies.com.
Have questions about sustainability, shipping, return, exchange or something similar?
Check our FAQ page.