Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy
- Regular Price
- $17.99
- Sale Price
- $17.99
- Regular Price
- $45.00
- Unit Price
- per
Details
Description:
- LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
- GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
- LONG DOG LEAD- Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs
Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI
Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead
Shipping & Delivery
How long will it take to ship my order?
Your order will be shipped within 3-8 business days.
How much does it cost?
We offer free trackable shipping on select items.
Shipping rates for partner brand items and international orders may vary and will be calculated at checkout.
Where is my order shipped from?
Big Frenchies apparel is shipped in plastic-free packaging directly from our Virginia facility. Items from our partner brands may have different packaging and can be shipped from any of their fulfillment locations worldwide.
How long does shipping take?
USA: 3-8 business days
CA, AUS, UK, and Europe: 5-21 business days
Rest of world: 5-25 business days
Return Policy
You have 14 days from delivery to request a return or exchange for most products shipped within the United States.* Exclusions apply.
*Exclusions
- Custom and handmade items are final sale and cannot be returned or exchanged, as they are crafted specifically to order.
- Returns are only available for US orders. International orders are final sale.
- For health and safety reasons, personal care items (like baby creams, shampoos, balms, sunscreens, and lotions) and food products cannot be returned once opened.
- Jewelry and watches are not returnable.
Restocking fee: a 10% restocking fee is deducted from your refund on change-of-mind returns. There is no fee if the item is defective, damaged, or not what you ordered.
As a small family-owned business, we thrive on your feedback, so it's vitally important for us to make sure you're happy with your purchase. Customers are responsible for return shipping costs unless the return is due to a defective product. Learn more about our full return policy.
You can reach out to our customer support team by submitting your request via the "Contact Us" form or by emailing us at support@bigfrenchies.com. A member of our support staff will respond to you as soon as possible.
Need Help? Get In Touch.
We'd love to hear from you!
The best way to reach us is via email: support@bigfrenchies.com.
Have questions about sustainability, shipping, return, exchange or something similar?
Check our FAQ page.